Mission 2 - Component 4 - Investment 2.1b

Implement a set of interventions that combine structural measures (securing against landslides or flood risk reduction in metropolitan areas) with other measures focusing on upgrading, monitoring and prevention of emerging risks.

General information

The measure is specifically dedicated to the mitigation and better management of hydrogeological risk, in particular with reference to the restoration of damaged infrastructure and the reduction of residual risk.

In detail

  • about 13.5 million euros have been earmarked for so-called "existing" works, i.e. works that had already begun as at 31 December 2021: these are fourteen interventions dedicated to hydraulic systems, rockfall and avalanche barriers and vallatomi aimed at restoring and making safe the provincial territory following the exceptional event of October 2018 (Vaia)
  • approximately €14.1 million has been allocated to Trentino for the implementation of four so-called 'new' intervention projects. Part of it is earmarked for risk mitigation works along Provincial Road 14 leading to Lake Tovel in Val di Non and part is earmarked for prevention works along the Adige riverbank.

Goals

Restoring damaged infrastructure and reducing residual risk in disaster-stricken areas on the basis of local investment plans.

Target: the implementation of interventions in Trentino contributes to the national target of fully completing the financed works by June 2026.

Start date

05/09/2019

End date

30/04/2026

Project duration notes

The projects have different start and end dates, but all between September 2019 and April 2026.

Reference documents

Parole chiave

Planning and funding

Planning tool

NRRP National Recovery and Resilience Plan
Mission 2 – Green revolution and ecological transition
C4 – Protection of the territory and water resources
I2.1.B – Measures for flood risk management and hydrogeological risk reduction

The implementation of the NRP in Trentino fits coherently into the programme framework for sustainable provincial development, according to the policies identified in the provincial Economic and Financial Document and its Update Note.

Source of funding

European funds
Extraordinary funds
NGEU – Next Generation EU

Total budget

£ 37,573,766.78

Budget notes

PNRR funding: € 27,650,273.55

Funding from PAT: € 5.578.560,87

State resources for Vaia Emergency: € 4,344,932.36

Monitoring

The "Outstanding Interventions" are technically concluded with the exception of CUP C27H20000480004, administratively the expropriation phase remains to be completed.

With regard to the "new projects", two are concluded and one is in the process of completion. Work on the 'Risk mitigation works along the S.P. 14 del Lago di Tovel - Val di Tovel (rockfall tunnel)' is in progress CUP 51B21008870004.

Communication

Avvisi PaT, comunicati stampa, approfondimenti

Documentation

Related projects

Links to external websites

Unique project code – CUP

codice
C17H19001640004 Work No. S-921 Construction of rockfall barriers from km 16.900 to km 18.100 approx.
C17H19001650004 Work no. S-923 Construction of rockfall barriers from km 89.000 to km 90.300
C97H20000630004 Work no. S-963 Construction of tomo valleys to protect the roadway of the S.S. 48 delle Dolomiti between progressions 41.600 and 41.800
C37H20000510004 Work S-966 Weather events 2018 Raising of Ceggio bridge on SP 65 Panoramica Valsugana
C27H20000490004 Work S-969 Weather events 2018 Construction of rockfall barriers to protect the SS 48 of the Dolomites from km 37.800 to km 38.800 approx.
C17H20000610004 Opera S-970 Meteorological events 2018 Setting up of rockfall barriers to protect the SP 56 road in Caoria from km 0.900 to km 1.800 approx. and hydraulic repair of the bridge
C77H20000570004 Work S-971 Meteorological events 2018 Construction of rockfall barriers to protect the SP 31 Manghen pass from km 7.600 to km 14.900 approx.
C17H20000620004 Opera S-972 Meteorological events 2018 Construction of rockfall barriers to protect the SP 31 Manghen pass from km 16,600 to km 17,600 approx.
C17H20000620004 Opera S-972 Eventi meteorologici 2018 Realisation of rockfall barriers to protect the SP 31 del passo Manghen from km 16,600 to km 17,600 approx.
C27H19001190004 Work no. S-919 Construction of avalanche and rockfall barriers from km. 40+400 to km. 45+900 approx. LOT 1
C97H20000640004 Work no. S-929 Weather events 2018 Realisation of rockfall and avalanche barriers from km 4.400 to approx. km 4.800 on the SS 346 San Pellegrino Pass
C27H20000480004 Work S-965 Weather events 2018 Protection of east tunnel entrance on SS 50 del Grappa and Rolle Pass from km 105.000 to km 105.700
C27H19001200004 Work no. S-919 Meteorological events 2018 Construction of avalanche barriers and rockfall barriers from Km. 40+400 to approx. Km. 40+700 on the S.S. 48 delle Dolomiti LOT 2
C97H19001340004 Work no. S-919 Eventi meteorologici 2018 Construction of avalanche barriers and rockfall barriers from Km. 45+830 to approx. Km. 45+900 of S.S. 48 delle Dolomiti LOT 3
C57H20002170003 Emergency road safety works to repair and replace damaged rockfall barriers from km. 25+000 to km. 27+100 of the S.S. 350 di Folgaria e di Val d'Astico in the municipality of Folgaria
C51B21008870004 Risk mitigation works along the S.P. 14 Lago di Tovel - Val di Tovel (rockfall tunnel)
C48H22000150004 Reinforcement of some sections of the left bank of the Adige river, between the confluence of the Fossa di Salorno and the confluence of the Faedo stream
C58H22000160004 Resurfacing of the left embankment and floodplain of the Adige river between the northern boundary of the province and the confluence of the Fossa di Salorno
C98H22000160004 Reinforcement of a few sections of the right embankment of the Adige River between the northern boundary of the Province and the village of S. Michele all'Adige