General information
The measure is specifically dedicated to the mitigation and better management of hydrogeological risk, with particular reference to activities for the restoration of damaged infrastructures and the reduction of residual risk.
Approximately EUR 13.5 million has been earmarked for so-called 'existing' works, i.e. already underway as at 31 December 2021: these are fourteen interventions dedicated to hydraulic systems, rockfall and avalanche barriers and vallatomi aimed at restoring and securing the provincial territory following the exceptional event of October 2018 (Vaia).
Goals
Restoring damaged infrastructure and reducing residual risk in disaster-stricken areas on the basis of local investment plans.
Target: the implementation of interventions in Trentino contributes to the national target of fully completing the financed works by 2025.
Start date
05/09/2019
End date
31/12/2025
Project duration notes
The projects have different start and end dates, but all between September 2019 and December 2025.