
Geothermal energy
In recent years, the use of geothermal resources, mainly for heating buildings, has become increasingly widespread also in Trentino. Since the end of 2009, regulations have been in force in the Province of Trento regulating the construction of closed-circuit geothermal plants and a map restricting their location in virtue of hydrogeological protection principles.
Other topics
Services
Paper restrictions for the installation of closed-circuit probes
Paper restrictions for the installation of closed-circuit probes
Anyone intending to build a closed-circuit geothermal plant must first check that the area of operation does not fall within the constraint areas of the Restriction Map. Cartography.
Publication date:Wednesday 08 November 2023
Installation of closed-circuit probes - Final balance as at 31/07/2022
The process for the construction of a closed-circuit geothermal plant and a summary of applications received and plants constructed from the entry into force of provincial regulations until 31 July 2022
Publication date:Wednesday 08 November 2023
GEOTERM Project
The GEOTERM project makes it possible to assess where in Trentino it is most cost-effective to install heat pumps associated with geothermal probes, systems that allow the heating, cooling and hot water needs of buildings to be met entirely and in all seasons of the year
Read more