This content is translated with an automatic translation tool: the text may contain inaccurate information.

Aid for testing and experimentation infrastructure - ERDF Notice No 1/2026

  • Under development

The application can be submitted, via the application platform, from 10 a.m. on 15 April 2026.

Notice aimed at supporting, within the framework of the 2021-2027 ERDF Programme, the construction of private testing and experimentation infrastructures in Trentino.

© TS - Dominio pubblico

Highlighted

Highlighted

Obligation to take out insurance against damage caused by natural disasters and catastrophic events. This is a requirement for access to benefits.

Description

The notice supports the construction in Trentino of new private testing and experimentation infrastructures aimed at testing innovative solutions and applications of interdisciplinary approaches with strong links between strategic sectors and enabling technologies.

The aid granted under the ERDF 2021-2027 Programme and under Provincial Law No. 6/2023 "Interventi a sostegno del sistema economico trentino" is governed by the Notice and by the provisions of a general nature common to all the measures.

What it finances

Projects for the construction of new private testing and experimentation infrastructures in Trentino are subsidised.

The subsidised infrastructures must be used for testing and experimentation activities aimed at developing new or improved products, processes and services and testing and updating technologies to achieve progress in industrial research and experimental development.

Use must be open to multiple users and granted in a transparent and non-discriminatory manner.

Applications are examined by means of an evaluation procedure.

Incentive

The incentive measure is calculated on the expenditure considered eligible and is determined in relation to the size of the enterprise as follows

  • micro and small enterprise: 45%;
  • medium enterprise: 35%;
  • large enterprise: 25%.

The incentive is granted under an exemption scheme pursuant to Commission Regulation (EU) 651/2014 of 17 June 2014.

Minimum and maximum expenditure limit

The minimum eligible expenditure must be greater than or equal to €200,000.

The maximum eligible expenditure limit is EUR 6 million.

Restrictions

Eligible projects must

  • be carried out within an operating unit located in the territory of the Province of Trento;
  • be completed within 12 months from the date the grant was awarded, without prejudice to any extension for a period not exceeding 6 months
  • be started after the date of submission of the application for the incentive.
Attenzione

The operating unit where the initiative subject to the incentive is carried out must meet specific requirements.

Check point 3(8) of the general provisions common to all measures for the conditions and requirements to be met by the operating unit.

Further obligations are set forth in the notice and in the general provisions common to all interventions. Among these are the obligations to maintain the operating unit on the provincial territory, and to be regular with social security and welfare institutions.

Who it's for

Enterprises of any size that meet the requirements set out in the Notice (check list of ineligible ATECO codes) and in the general provisions common to all measures.

What to do

The application may be submitted online as of

  • from 10.00 a.m. on 15 April 2026
Attenzione

Applications must be submitted to the investigating entity via the IT platform accessible from the digital channel link below available from 10.00 a.m. on 15 April 2026
Access is possible through the Sistema Pubblico di Identità Digitale (SPID) or through a Digital Identity Card by the legal representative or his/her delegate.

What you need

Documents to be submitted

  • incentive application (to be completed in SIFESR)
  • project fiche (to be completed in SIFESR)
  • declaration of dimensional parameters
  • business plan
  • positive evaluation by a credit institution or leasing company as per point 3, paragraph 7 of the general provisions common to all interventions
  • proxy (if any)
  • privacy policy

Timeframes and deadlines

Preliminary investigation activities begin the day after the date of submission of the application.

The decision to grant the incentive is adopted within 120 days starting from the day following the submission of the application, without prejudice to suspensions pursuant to the provincial law on administrative activity.

The incentive is liquidated by the investigating body following the reporting of the expenses incurred by the enterprise requesting the incentive and the acquisition of the declaration certifying compliance with the obligations and constraints expired to which the enterprise is subject.

An interim report may be submitted upon reaching an amount of expenditure, including indirect costs, at least equal to 50% of the amount admitted.

Costs

Revenue stamp
16,00 Euro

Access the service

Authentication

SPID Level 2
Electronic Identity Card (CIE)

Documents

Reference regulations

Programma FESR 2021-2027 - Obiettivo strategico «Un''Europa più competitiva e intelligente" - Priorità 1 "Trentino competitivo" - Obiettivo specifico ai) "Sviluppare e rafforzare le capacità di ricerca e di innovazione e l''introduzione di tecnologie avanzate" - Approvazione dello schema di Avviso FESR n. 1/2026 - "Sostegno alla realizzazione di nuove infrastrutture di prova e sperimentazione sul territorio trentino".

Read more

Disposizioni di carattere generale e comune a tutti gli interventi della Legge provinciale 6 luglio 2023, n. 6 “Interventi a sostegno del sistema economico trentino”.

Read more

Interventi a sostegno del sistema economico trentino

Read more

Additional information

Last modified: 17/03/2026 6:03 pm

Sito web OpenCity Italia · Site editors access