General information
The project aims to provide connectivity ≥ 1 Gbit/s download and 200 Mbit/s upload to Real Estate Units that are not covered (and will not be covered by 2026) by at least one network capable of ≥ 300 Mbit/s download speed.
Goals
Ensuring adequate connectivity throughout the territory, with coverage of the remaining white areas outside the perimeter of the Open Fiber concession and of the grey areas affected by the Bul tender, i.e. those areas where the private telecommunications operator does not invest because it is not economically viable.
About 23,000 house numbers are affected.
Start date
01/07/2022
End date
31/12/2026
Project website
https://innovazione.gov.it/dipartimento/focus/piano-italia-a-1-giga/