Initial complaint for superelevation work

  • Active

Filing with the Sportello Cementi Armati (Armed Cements Desk) of the initial report for raising work and request for the relative certification pursuant to Presidential Decree 380/2001 art. 90.

Description

Restrictions

The declaration must be made before the start of the structural works, and the successful completion and submission of the relevant certification must be awaited before work begins.

Who it's for

Construction companies carrying out structural works or professionals delegated for filing.

What to do

The report complete with all the documentation must be submitted through the SUAP portal of the Autonomous Province of Trento only for raising works.

Please note that, pursuant to Council Resolution No. 1413 of 27/08/2021, 'the mere recovery of an attic for residential purposes of an existing building, for which the agibility permit has already been issued, does not constitute raising, if the pre-existing floor is used without substantially altering the static and seismic behaviour of the building'. On the other hand, the intervention must be classified as raising 'when a new floor is built or when the intervention produces said substantial alteration of the static and seismic behaviour of the building'.

Stages of access to the service

What you need

Documents to be submitted

The SUAP portal guides you through filling in various screens and uploading attachments:

  • MDA form - generated by the SUAP;
  • Summary list - generated by the SUAP;
  • Power of attorney (if any) of the company/ies to an attorney for the submission and signature of the complaint;
  • Appointment form of the tester;
  • Acceptance form of the tester;
  • Illustrative report form;
  • Structural designer's asseveration form for superelevation works;
  • Complete structural project of all components;
  • Architectural project;
  • Any other free attachments.

Please note that:

  • all documents must be saved in PDF/A prior to signing;
  • documents signed with handwritten signatures must be accompanied by a copy of an identity document of the signatory.

Timeframes and deadlines

30 days

Maximum no. of waiting days

Barring suspensions due to requests for additional documentation.Pursuant to Art. 3 para. 4 of Provincial Law 23/1992.

Costs

Stamp
16,00 Euro

for request

Stamp mark
16,00 Euro

for authorisation

Documents

Reference regulations

Manuale operativo per la presentazione di pratiche strutturali attraverso il portale SUAP della Provincia Autonoma di Trento.

Read more

Additional information

Last modified: 11/06/2025 12:18 pm

Sito web OpenCity Italia · Site editors access