Hydrogen production on brownfield sites

Mission 2 - Component 2 - Investment 3.1

Setting up renewable hydrogen production plants in disused industrial areas, creating a Hydrogen Valley in Trentino.

General information

New plants for the production and storage of green hydrogen, useful for the development of a sustainable local economy, will be put into operation in disused industrial areas: green hydrogen, produced using only renewable energy sources, is a key tool for a more sustainable energy system and for achieving the decarbonisation targets set for 2030 and 2050, as envisaged by the PNRR.

The interventions envisage an electrolyser for the production of renewable hydrogen and related auxiliary systems necessary for the production process, including any hydrogen compression and storage systems, as well as one or more additional auxiliary plants, including any storage systems for the electricity produced.

In order to keep costs down, disused areas already connected to the electricity grid will be used: electrolysers for hydrogen production through RES (Renewable Energy Sources) over-generation or dedicated RES production in the area will be installed there.

The following three projects were approved for funding in March 2023:

  1. H2_POLYTECH, presented by Polytec Energy Srl and Polytec SPA, which was granted a contribution of €7,499,731.61 for interventions to be carried out in the Storo and Borgo Chiese areas;
  2. PNRR M2C2-I3.1 ROVERETO, presented by Dolomiti Energia Holding spa, which was granted a contribution of €5,506,500 for work to be carried out in the Rovereto area;
  3. GREEN HYDROGEN PRODUCTION PLANT AT THE CARTIERE DEL GARDA FACILITY, presented by Cartiere del Garda spa, which was granted a contribution of € 993,768.39 for an intervention in the Riva del Garda area. The company subsequently communicated that it renounced the granted contribution.

Goals

Supporting the local production and use of green hydrogen by creating new districts (hydrogenvalleys), where hydrogen is produced from renewable sources in the area and used locally, and promoting the reuse of brownfield sites.

Start date

13/07/2023

End date

30/06/2026

Reference documents

Parole chiave

Planning and funding

Planning tool

NRRP National Recovery and Resilience Plan
Mission 2 – Green revolution and ecological transition
C2 – Renewable energy, hydrogen, network and sustainable mobility
I3.1 – Hydrogen production in brownfield sites (hydrogen valleys)

The implementation of the NRP in Trentino fits coherently into the programme framework for sustainable provincial development, according to the policies identified in the provincial Economic and Financial Document and its Update Note.

Source of funding

European funds
Extraordinary funds
NGEU – Next Generation EU

Total budget

£ 14,000,000.00

Budget notes

PNRR funding (following waiver): € 13,006,231.61

Monitoring

The following were financed 2 projects (net of of renunciation of the project for a green hydrogen production plant at the Cartiere del Garda mill).

Communication

Avvisi PaT, comunicati stampa, approfondimenti

Related services

NRP - M2C2I3.1: Production of renewable hydrogen on brownfield sites

Public notice aimed at the selection of project proposals for the construction of renewable hydrogen production plants in brownfield sites and financed by the EU under the NRP Mission2 Component2 Investment 3.1

Links to external websites

Unique project code – CUP

codice
C33D23000030004 interventions in the Storo and Borgo Chiese areas
C73D23000020006 intervention in the Rovereto area