General information
The modernisation of the sewage and purification network is a major issue in Italy, which has led to some infringement proceedings by Europe. The plants will follow, where possible, the 'green factories' model, so as to allow the recovery of energy and sludge and reuse the purified waste water for industrial or irrigation purposes.
Specifically for Trentino, two project proposals submitted by the Province of Trento to the Ministry were considered eligible, including theAdaptation of the wastewater treatment plant in the Municipality of Mezzana (TN).
The intervention consists in the enlargement of the purification plant in Mezzana, serving an area strongly characterised by a high number of fluctuating presences in the accommodation sector (the compendium is Folgarida-Marilleva-Madonna di Campiglio).
The increase in the number of users and, above all, the growing contribution of white water in the network, have made the purification compartment undersized, with frequent discharges of excess flows into the river bed. Therefore, in order to allow the preservation of the purification plant's potential and the environmental quality of the watercourse, a structural enlargement of the purification plant is necessary. AE 30,000.
Goals
Making waste water purification more effective also through technological innovation.
Start date
09/08/2023
End date
30/03/2026
Project duration notes
The date of 30/03/2026 refers to the acceptance of the work.