Towards a safe and sustainable hospital

Mission 6 – Component 2 – Investment 1.2

Bringing hospital buildings into line with anti-seismic regulations

General information

This investment involves seismic retrofitting worksin line with the new regulatory framework in this area. Hospitals play a strategic role, both because of their vital function in providing emergency care to the population and because of their greater level of exposure in the event of earthquakes, as they accommodate a very large number of people with varying levels of responsiveness.

Specifically, this involves:

  • 2 structural projects funded by the PNRR for the refurbishment and seismic upgrading of the Borgo Valsugana Hospital and the Perusini Wing in Pergine Valsugana (target: at least 1 project funded by the PNRR)
  • 4 structural projects funded by the PNC for the existing Vannetti Care Home in Rovereto and for Pavilions A and B of Arco Hospital (target: 4 projects funded by the PNC)

Goals

To improve the safety of hospital buildings by bringing them into line with current building regulations for earthquake-prone areas.

Start date

12/06/2023

End date

30/12/2026

Project duration notes

PNRR projects will be completed by June 2026; PNC projects will be completed by December 2026.

Reference documents

Parole chiave

Planning and funding

Planning tool

NRRP National Recovery and Resilience Plan
Mission 6 – Health
C2 – Innovation, research and digitalisation of the national health service
I1.2 – Towards a safe and sustainable hospital
CNP Complementary National Plan

The implementation of the PNRR in Trentino forms an integral part of the provincial policy framework for sustainable development, in line with the policies set out in the Provincial Economic and Financial Document and the related Update Note.

Source of funding

European funds
Extraordinary funds
NGEU – Next Generation EU
National funds
Provincial funds

Total budget

£ 20,370,000.00

Budget notes

PNRR funding: €5,225,791

PNC funding: €11,860,975

Monitoring

The target has been met for the Perusini building in Pergine Valsugana (PNRR), for which the administrative certification process has been completed.

Work on the former Vannetti care home in Rovereto (PNC) and on the three projects at Arco Hospital (PNC) is either underway or due to start shortly, and will be completed by 31 December 2026.

Unique project code – CUP

codice
B35F25000160006 Borgo Valsugana Hospital – seismic retrofitting of the 1st floor
B75F23000250006 Existing Vannetti Care Home in Rovereto – seismic retrofitting of the north-west wing (block B)
B35F23000200001 Perusini Pavilion, Pergine Valsugana – structural reinforcement
B56G25000210001 Arco Hospital (demolition of Pavilion A)
B55F25000130001 Arco Hospital (reconstruction of Pavilion A)
B56G25000220001 Arco Hospital (seismic retrofitting of Ward B)