General information
The project involves the construction of an external insulation (coat) on the vertical opaque surfaces and the replacement of the existing windows and doors with new ones with better energy performance.
The works, entrusted through a negotiated procedure without prior publication of a call for tenders, were divided into two lots:
- Lot 1: window and door frame works (CIG B45A63449D).
- Lot 2: painter's works (CIG B47AEEB9B9).
Goals
The aim is to make the current school building more energy efficient, reducing its energy consumption and thus contributing to the decarbonisation goals of the Trentino energy system.
Start date
21/12/2023
End date
31/10/2026