General information
The Community Centre will serve as a permanent point of reference to ensure the promotion andprevention of ill health and the provision of care for the local community, particularly for those with chronic conditions, and will also be equipped with IT infrastructure (telemedicine) and multi-specialist medical equipment. It will serve as a single point of access to local health and social care services, operating in coordination with the hospital network to ensure local services are available to residents.
The organisational model, which is already in place in the area, will be further strengthened through structural investments that will affect, to varying degrees, existing facilities (similar in function to the ‘Case della Comunità’), as well as facilities that will be adapted for this purpose, including newly built ones.
Community Centres are planned for Ala, Cles, Borgo Valsugana, North Trento, Malé, Sen Jan di Fassa, Riva del Garda, Rovereto, Pergine Valsugana, Mezzolombardo and South Trento.
Goals
To provide an integrated response to basic healthcare needs, with permanent points of contact for the population that ensurethe local community is properly cared for, including through a blood-taking facility, a range of specialist and basic diagnostic equipment, and an IT infrastructure.
Target: a minimum of10 Community Centres, whilst also ensuring energy efficiency.
Start date
18/02/2022
End date
31/05/2026
Project duration notes
The projects have different start and end dates, but they all fall between February 2022 and March 2026.