General information
This is an investment specifically dedicated to the dissemination of green local public transport that also includes a programme to renew the bus fleet towards low/zero emission solutions.
This measure is also intended to accelerate the provisions of the National Strategic Plan for Sustainable Mobility (PSNMS), which aims at a progressive renewal of buses. At a territorial level, these funds were granted to TrentinoTrasporti SPA, which called for the relevant tenders for the supply of
- 9 electric busesand their charging stations financed with funds allocated to the Province of Trento to cover the Trento-Lavis-Zambana section with a high-capacity, high-priority line with a reserved lane between the city centre and the northern suburbs. The service will increase from an hourly capacity of approximately 300 passengers per direction to a maximum of 800 passengers during peak hours depending on frequency. The aim is a reduction in carbon dioxide emissions estimated at 400 tonnes less per year and a positive energy balance with a primary energy reduction of approximately 13%.
- 7 electric buses and related recharging stations financed with funds allocated to the Municipality of Trento and related electrification of lines 7 and 11 in the provincial capital, with 'light' recharging infrastructures at the terminuses. The aim is a reduction in carbon dioxide emissions estimated at 600 tonnes per year and a reduction in primary energy.
Goals
Accelerate the implementation of the strategic plan for sustainable mobility with the progressive renewal of the local public transport fleet, the reduction of the average age of vehicles and the construction of dedicated charging infrastructures.
Start date
30/09/2022
End date
31/12/2026
Project duration notes
The end date as of 30/06/2026 refers to the 7 buses financed with funds allocated to the Municipality of Trento. The end date as of 31/12/2026 refers to the 9 buses financed with funds allocated to the Province of Trento.