Authorisation of plants for electricity production (conventional sources)

  • Active

Application for authorisation to construct and operate plants for the production of electrical energy using conventional sources with a thermal output of more than 1 MW and less than 300 MW

Who it's for

The application may be submitted by public bodies, private entities, companies

What to do

The procedure begins with the submission of the application by the interested party; the next stage involves the examination of the application and the attached documentation; if necessary, the competent structure requests integrations and any nulla-osta; the process ends with the adoption of the authorisation by the manager of the competent structure and its transmission to the applicant.

What you need

Documents to be submitted

  • technical report with graphic drawings of the plant, indicating the specific activity for which the plant is to be used, the production cycle, an indication of the expected time for the plant to become fully operational, the use of the electrical energy produced, the requirements for which the plant is to be built, the characteristics of the connection to the national electrical system, the operating methods and the quantity, type and commodity characteristics of the fuels to be used, the techniques adopted to limit emissions and the quantity and quality of such emissions as well as, for plants subject to this condition, the technical minimum defined through the plant parameters that characterise it
  • specifictechnical report demonstrating compliance with the provisions of Presidential Decree 29-136/Leg. of 30/07/2008 and Annex 2 to the Provincial Environmental Energy Plan 2013-2020
  • sworn expert's report certifying the quality and quantity of polluting emissions into the atmosphere
  • models of the Provincial Environmental Protection Agency for the authorisation of atmospheric emissions from new plants and existing plants: Mod. B and Mod. B1/B2 photocopy of an identity document of the applicant (if the application is signed with a handwritten signature and not in the presence of the employee in charge)

Forms

Timeframes and deadlines

The application may be submitted at any time of the year

150 days

Maximum no. of waiting days

From the first working day following the date of receipt of the application by the competent structure.

Costs

Tax stamp
16,00 Euro

Except in cases of exemption under Presidential Decree 26.10.1972 no. 642, Table B

Contacts

Contatti di Servizio gestione integrata energia e grande idroelettrico - aprie

Email - Segreteria:
serv.gdienergia@provincia.tn.it

Pec - Segreteria:
serv.gdienergia@pec.provincia.tn.it

Telefono - Segreteria:
0461.497310

Telefono - Segreteria:
0461.497307

Fax - Segreteria:
0461.497301

Contatti di Ufficio gestione integrata energia

Email - Segreteria:
serv.gdienergia@provincia.tn.it

Pec - Segreteria:
serv.gdienergia@pec.provincia.tn.it

Telefono - Segreteria:
0461.497310

Telefono - Segreteria:
0461.497307

Fax - Segreteria:
0461.497301

Additional information

Last modified: 25/02/2026 12:17 pm

Sito web OpenCity Italia · Site editors access