This content is translated with an automatic translation tool: the text may contain inaccurate information.

Construction of first home cooperatives - call 2021

  • Active

If you are a co-operative that has obtained the grant for the construction of a first dwelling house for members, notify the issuance of the building permit, if not declared in the application, and submit the statement of expenses

Description

Declaration of issuance of the building permit

Within 27 months of receipt of the grant notice, the cooperative must declare that it has obtained the building permit if not already communicated in the grant application, under penalty of forfeiture.

Application for extension of the grant reporting deadline

Before the expiry of the reporting deadline the cooperative may apply for a single extension of the deadline for a maximum of 24 months for justified reasons.

Reporting

Within 48 months from the date of issuance of the building permit or from the date of commencement of works in the case of a building permit acquired before 7 August 2020, the cooperative must submit the accounts of the expenses actually incurred, under penalty of forfeiture.

The grant shall be recalculated on the basis of the expenses indicated in the statement of account.

Restrictions

Constraints, sanctions and cases of forfeiture of the contribution are regulated in Articles 22 and 23 of the Call for Proposals. Cooperatives are invited to read them carefully.

Who it's for

Individually owned housing cooperatives that have been granted the subsidy for the construction of a first dwelling house for their members.

What to do

The documentation must be drawn up on the appropriate form and sent to the Territorial Cohesion, Housing Policies, Enhancement of Trentino's social capital abroad Service, by one of the following methods

  1. by electronic mail (certified or plain) to the mailbox serv.casaecoesione@pec.provincia.tn.it;
  2. by registered mail with acknowledgement of receipt to the Territorial Cohesion, Housing Policies, and Enhancement of Trentino's Social Capital Abroad Service; in this case, the postmark of the accepting post office shall serve as proof.

In the event of transmission by methods other than those indicated, the submission is inadmissible pursuant to Article 7(7) of the notice.

What you need

Documents to be submitted

Declaration of issuance of building title

on special form with attachment:

  1. privacy policy
  2. photocopy of identity document of signatory
Application for extension of deadline

on special form with attached photocopy of identity document of the undersigned

Reporting of expenses incurred

on appropriate form with attached

  1. declaration certifying that the members receiving the grant are registered with the cooperative and that the members have signed the reservation record for the housing unit
  2. declarations by the booking members certifying the composition of the family unit to which the grant is to be awarded and that they meet the requirements set forth in Article 21b
  3. copy of the energy performance certificate (APE) or of the ARCA/equivalent certificate for the whole building
  4. dimensioned plan of each supported housing unit drawn up on a scale of 1:50 signed by a qualified technician indicating the usable living area and the destination of the rooms
  5. privacy policy
  6. photocopy of an identity document of the signatory
Formats of the documentation transmitted electronically

When transmitting the documentation electronically, the files must have one of the following formats (and extensions) PDF/A, PDF, XML, TXT, TIFF, TIF, JPEG, JPG, JFIF, JPE and EML, BMP, CSV and GIF. The HTML format is also permitted, limited to the body of the e-mail message. Compressed formats (e.g. .zip) are not accepted, as the unambiguous identification of compressed and/or enveloped files is not guaranteed either by the certified e-mail service or by the document management system.

Forms

Timeframes and deadlines

Grant redetermination: 90 days from the day following the date of submission of the grant statement

Grant extension: 45 days from the day following the date of receipt of the request for extension

Disbursement: within 30 days from the date of execution of the redetermination measure.

Costs

Stamp (for extension application)
16,00 Euro

Documents

Reference regulations

Assestamento del bilancio di previsione della Provincia autonoma di Trento per gli esercizi finanziari 2020 - 2022

Read more

Allegato 1 Del. G.P. n. 1043 di data 18 giugno 2021 aggiornato con Del. G.P. n. 1289 del 30/07/2021; Del. G.P. n. 973 del 27/05/2022; Del. G.P. 1532 del 26 agosto 2022 e Del. G.P. 464 del 17 marzo 2023

Read more

EDILIZIA ABITATIVA AGEVOLATA: Legge provinciale 6 agosto 2020 n. 6 - art. 25. Approvazione del bando di contributi per la costruzione della prima casa di abitazione.

Read more

EDILIZIA AGEVOLATA: Legge provinciale 6 agosto 2020 n. 6 - art. 25. Modificazione dell'allegato 1) della deliberazione n. 1043 del 18 giugno 2021 contenente il 'Bando di contributi per la costruzione della prima casa di abitazione' e proroga dei termini di presentazione delle domande per i soggetti privati.

Read more

EDILIZIA ABITATIVA AGEVOLATA: Legge provinciale 6 agosto 2020 n. 6 - art. 25. Bando di contributi per la costruzione della prima casa di abitazione. Rimodulazione delle risorse prenotate con deliberazione della Giunta provinciale n. 1043 del 18 giugno 2021.

Read more

EDILIZIA AGEVOLATA: Legge provinciale 6 agosto 2020 n. 6 - art. 25. Modificazione dell'allegato 1) della deliberazione n. 1043 del 18 giugno 2021 contenente il 'Bando di contributi per la costruzione della prima casa di abitazione' e proroga dei termini di presentazione delle domande per i soci di cooperativa a proprietà individuale (codice CUP C46H21000000003).

Read more

EDILIZIA AGEVOLATA: Legge provinciale 6 agosto 2020 n. 6 - art. 25. Ulteriore modificazione dell'allegato 1) della deliberazione n. 1043 del 18 giugno 2021 contenente il 'Bando di contributi per la costruzione della prima casa di abitazione', come successivamente modificato con deliberazioni n. 1289 del 30 luglio 2021 e n. 973 del 27 maggio 2022 - Richiesta di contributo da parte delle cooperative edilizie a proprietà individuale e proroga dei termini di presentazione delle domande (codice CUP C46H21000000003).

Read more

EDILIZIA AGEVOLATA: Legge provinciale 6 agosto 2020 n. 6 - art. 25. Ulteriore modificazione dell'allegato 1) della deliberazione n. 1043 del 18 giugno 2021 contenente il 'Bando di contributi per la costruzione della prima casa di abitazione', come successivamente modificato con deliberazioni n. 1289 del 30 luglio 2021, n. 973 del 27 maggio 2022 e n. 1532 del 26 agosto 2022 - prolungamento del termine di presentazione della dichiarazione sostitutiva di atto notorio attestante il rilascio del titolo edilizio da parte del Comune (codice CUP C46H21000000003).

Read more

Additional information

Last modified: 29/12/2025 11:07 am

Sito web OpenCity Italia · Site editors access