Authorisation for the construction and operation of power lines
Active
Il servizio online al momento non è disponibile
Ordinary procedure - authorisation separate from construction and operation - authorisation of substantial variations to already authorised power lines
The procedure begins with the submission of the application by the interested party; the next stage involves the examination of the application and the attached documentation; if necessary, the competent structure requests integrations and any nulla-osta; the process ends with the adoption of the authorisation by the manager of the competent structure and its transmission to the applicant.
What you need
Documents to be submitted
The documents to be submitted are listed in detail at the bottom of each form.